Lenel Lnl-3300-m5 Installation Manual Upd -
Lenel LNL-3300-M5 Installation & Migration Guide The Lenel LNL-3300-M5 Go to product viewer dialog for this item.
Completely power down the legacy controller and disconnect the backup battery.
Label and unplug the field wiring and the power/comm board connectors from the legacy CPU. Lenel Lnl-3300-m5 Installation Manual UPD
is an Intelligent System Controller (ISC) designed specifically for the system. It serves as a plug-compatible, Mercury-based hardware replacement for legacy CASI M5 and M3000 boards , facilitating a modern migration path for systems like Picture Perfect , FCWnx , and Secure Perfect . 1. Pre-Installation Preparation
Before beginning, ensure you have the following requirements and tools: 12 VDC ± 10% at approximately 300mA. Lenel LNL-3300-M5 Installation & Migration Guide The Lenel
The board is designed to retrofit into legacy CASI M5/M3000 enclosures.
OnGuard software must be licensed and configured for the LNL-3300 series. Pre-Installation Preparation Before beginning
A standard Cat5/6 cable for Ethernet and shielded twisted pair (24 AWG) for RS-485 downstream communication.


