Srps En 13670 May 2026

One of the most critical aspects of this standard is its role as a "handshake" between the designer and the contractor.

Protocols for tensioning and grouting of prestressing tendons. Detailed rules for the entire process, including: Placing: Ensuring no segregation of the concrete mix. Compaction: Removing air voids via vibration. srps en 13670

Requirements for the design and construction of molds (formwork) and their supports (falsework). It ensures they are stiff enough to hold the weight of wet concrete and achieve the required surface finish. One of the most critical aspects of this

The design rules in Eurocode 2 (SRPS EN 1992) are built on the fundamental assumption that the execution of the project will comply with SRPS EN 13670. Compaction: Removing air voids via vibration

is the "Bible of Workmanship" for concrete in Serbia. By standardizing everything from how a formwork is propped to how long a slab must be cured, it ensures that the safety calculations made by designers are actually realized on the construction site. For any construction professional in the region, mastery of this standard is not just a regulatory requirement but a prerequisite for building durable, safe infrastructure. SRPS EN 13670:2012

This article provides a deep dive into the scope, key requirements, and practical application of SRPS EN 13670 in the Serbian construction industry.

This section defines . Depending on the complexity and importance of the structure, projects are assigned a class (typically 1, 2, or 3). Higher classes require more stringent quality management, documentation, and inspection. Formwork and Falsework